
Decide fast, but not blind
Water damage forces quick decisions. Extraction should begin the same day, so you may have an hour to choose. A short list of questions helps you compare companies without a long research project, and it works whether you are choosing us or anyone else.
Ask for answers in plain words. A good contractor explains what they will do, what it costs to find out and what they cannot promise. If answers are vague, keep looking.
Ten questions worth asking on the phone
- Are you registered with the Connecticut Department of Consumer Protection as a home improvement contractor, and can I check?
- Are you insured, and can you provide proof?
- Do your crews work to the ANSI/IICRC S500 water damage standard, and how do you verify dryness?
- How do you decide what to dry in place and what to remove?
- Will I see daily moisture readings?
- How is the price set, and what is the scope in writing?
- What is separate from drying, such as repairs and rebuilding?
- Will you work with my insurer, and what records will you give me?
- Who will be at my house, and who is my contact?
- What happens if readings are not normal at the end of the job?
Do not expect a final price without seeing the space. Do expect a clear explanation of how the price will be set. Be careful with anyone who offers a number before asking what happened.
Registration and insurance
Connecticut requires home improvement contractors to register with the Department of Consumer Protection, and the department provides a lookup. Home inspectors are licensed too. Check the contractor's registration before you sign, and ask for proof of insurance.
The Connecticut Insurance Department warns about contractor fraud after storms on its Be Weather Ready CT page. Door-to-door offers, pressure to sign right away and requests for large up-front payments are all reasons to slow down.
Red flags
A price with no questions
A quote before anyone asks about the water or the area is a guess.
Pressure to sign on the spot
A good contractor can explain and wait a moment.
No written scope
Verbal promises are hard to enforce when a claim is reviewed.
Vague or no readings
If no one measures moisture, no one knows when the job is done.
Also be careful with promises you cannot check, such as a fixed promise of when a crew will show up or a guarantee that mold will never return. No honest contractor can promise those.
What a good scope looks like
A written scope should include
- The areas and materials affected.
- Water category and how it was determined.
- What will be removed, and why.
- Equipment to be placed and how long it is expected to run.
- How dryness will be confirmed.
- What is included and what is separate.
If you want to see how a straightforward job is described, our water extraction page and structural drying page lay out the steps in plain words.
Working with your insurer
Your insurer may suggest a contractor. You generally choose your own, so read the policy and ask in writing if you are unsure. Whoever you pick, ask them to share photos, readings and the scope so the adjuster can review them.
Keep your own file. Names, dates, invoices and photos are your protection if anything is disputed later.
Comparing two quotes the right way
Quotes rarely match line for line. One may remove wet baseboards and the other may leave them. One may budget three days of drying equipment and the other seven. Lay the two side by side and compare scope, equipment days, materials removed and what happens if the readings are not normal at the end of the job.
Ask each company to explain the largest difference. A good explanation is specific, such as the water was Category 2, so the pad comes out. A weak one is vague, such as that is just how we do it.
Before work begins
Final checks before you sign
- Read the scope and the payment terms twice.
- Confirm who will be at the house and when.
- Ask how and when you will see moisture readings.
- Keep a signed copy of every document.
- Take photos of the house before the crew starts.
Never sign a blank form or an assignment of insurance benefits you do not understand. If a contract has anything you cannot follow, ask for a plain explanation or have your attorney read it.
Scope questions for specific losses
For a pipe burst, ask how they will find the hidden spread and whether they will open walls or dry in place. For a flood, ask how they handle contaminated water and what protective measures they use. For a sewage backup, ask about containment and disposal. For mold, ask who does clearance testing and whether it is independent.
The right answers are specific. A contractor who has done this often will describe steps and tradeoffs without hesitation, and will say plainly what they do not do.
Comparing written scopes side by side
If you collect more than one scope, line them up. Check that each lists the same rooms, the same materials and the same drying steps. A price that looks low may leave out something the other one includes.
Ask each contractor to explain the biggest difference between their scope and the others. Their answer tells you how they think about the job.
Choosing a contractor around Shelton
Shelton's Building Department, at City Hall, 54 Hill Street, can tell you whether a job needs a permit. A contractor who says no permit is needed for a large rebuild should put that in writing, and you can check with the department yourself.
If you are in Derby or Orange, ask whether your address sits in a mapped flood zone, since that can change what repair work requires. Neighbors, local property managers and your insurance agent are good sources for names, but check each against the registration lookup.
Local hiring questions
The Department of Consumer Protection provides an online lookup for registered home improvement contractors. Check it before you sign.
If you can, yes, but extraction should not wait. Start extraction first and compare drying and repair scopes after.
Not necessarily. Compare scope, equipment days and what is included. A low price with little scope can cost more later.
Generally no. Read your policy and ask your insurer in writing.